Wej It Fastening Systems
PRODUCTS
FAQ

  Sales: 888-864-4537
  Fax: 203- 857-2201
  Email: info@wejit.com

Strike-It Center Pin Anchors



Installation Instructions
  1. Drill the hole perpendicular to the work surface. To assure full holding power, do not ream the hole or allow drill to wobble. Clean hole using compressed air and a nylon brush. A clean hole is necessary for proper performance.
  2. Preset the nut and washer for desired embedment.
  3. Hammer center pin until it is aligned with the top of the bolt.
  4. Tighten nut.

NOTE: Always wear safety glasses. Follow drill manufacturer's instructions. Use only solid carbide-tipped drill bits meeting ANSI B212.15 diameter standards.



©2002-2012 The Mechanical Plastics Corp., all rights reserved.
® & denote trademarks owned by or licensed to Mechanical Plastics Corp., its affiliates, or partners. | Legal